Tender No.
Department
Subject
Closing Date
Download
Corrigendum
25/SE/RRNMU-Bwn-Circle/2024-25 (2 nd Call)
PMGSY-III, 2024-25, BATCH-I
Construction of 3 x 21.0 mtr Span Bridge on Mohandhawra to Ramdhani market via Kalidasdhawra within Baraboni Block
07.03.25
32/SE/RRNMU-Bwn-Circle/2024-25 (2 nd Call)
PMGSY–III, BATCH- I of 2024-25
MRL06-GUTULIA TO LASKARBANDH, DURGAPURFARIDPUR BLOCK (Road Length: 7.540 km) and MRL03-SHIBPUR (PART OF SHIBPUR GOURBAZAR RD.) TO SRIMPUR, KANKSA BLOCK (Road Length: 6.750 km)
07.03.25
33/SE/RRNMU-Bwn-Circle/2024-25 (2 nd Call)
PMGSY–III, BATCH- I of 2024-25
MRL11-GOSWAMIMALIPARA TO BILAYETPUR VIA HARIT under PolbaDadpur Block (Length: 6.750 km) and T01-RAJHATI VIMTALA TO KAKNAN under Khanakul-II Block (Length: 6.094 km)
07.03.25
31/SE/RRNMU-Bwn-Circle/2024-25 (2 nd Call)
RRNMU, BARDHAMAN CIRCLE
MRL03-Ranibandh more to Indrapur more Road, KALNA-I BLOCK (Road Length: 8.650 km) and T06-Bonkapasi to Purba Gopalpur Road, MONGOLKOTE BLOCK (Road Length: 7.100 km) PMGSY–III, BATCH- I of 2024-25
07.03.25
24/SE/RRNMU-Bwn-Circle/2024-25 (2 nd Call)
RRNMU, BARDHAMAN CIRCLE
Construction of 3 x 21.0 mtr Span Bridge on Unbridge Gap over PMGSY Road namely Khatundi to Chitahati Road within Ketugram-II Block (PMGSY-III, 2024-25, BATCH-I)
07.03.25
burdwanzp.org © Purba Bardhaman Zilla Parishad. 2014-2025Disclaimer
Website Design and Developed by Sabmecto